The bridge is the second I have built on my school trail in the past year. This spot was in need of a complete re-build. Dave C. and I built the original bridge about 4 or 5 years ago. Thanks to my principal and the PTO for the materials. Thanks to Luke for the help! These kids at my school are lucky!!
Monday, March 14, 2011
Bridge Build 2
The bridge is the second I have built on my school trail in the past year. This spot was in need of a complete re-build. Dave C. and I built the original bridge about 4 or 5 years ago. Thanks to my principal and the PTO for the materials. Thanks to Luke for the help! These kids at my school are lucky!!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment